The Builder’s Guide to Modern GBQ
On Modern GBQ, the work comes to you already scoped: homeowners arrive with an approved, professionally structured estimate — engineered quantities, priced lines, a defined scope — and builders are invited to respond to it. Your job is to answer well and on time. This guide covers your workspace, the invitation flow, the blind comparison every homeowner sees, and the rating that follows your organisation around.
What Modern GBQ does for builders
Most enquiries a builder receives are a sketch and a hope. A Modern GBQ invitation is different: the homeowner has already described the project, the Grace Estimation Method (GEM) has computed the engineered quantities with its working shown, and every line has been priced from published supplier offers or indicative market rates plus trade labour rates — each line says which. You are asked to respond to that scope — and every builder invited to the same project is responding to exactly the same one. The homeowner then reads the responses blind, numbers before names, so the quality of your answer is what carries the round.
- What you price
- an approved, GEM-structured scope — every line, quantity and excluded item
- Ways to respond
- Accept · Revised proposal · Request discussion · Decline
- How you are compared
- blind first — numbers before names
- Your rating
- starts at 5.00; only declining after selection lowers it
Create your account and organisation
Where: Create account, then My organisation in the sidebar
Register at Create account with your name, email and password, choose Builder as who you are, and give your business name — your builder organisation is created with the account, there is no code to invent. Pick your market (Australia or Egypt — it decides which Terms of Service and Privacy Policy apply, and each opens in a new tab so you can read it first) and agree to them. Because builders trade on the marketplace, the same form asks you to read and accept the Marketplace Agreement — the additional terms that govern invitations, responses and selection conduct. Confirm your email from the link we send, then log in. Every legal document is always readable at the Legal page, without logging in.
A new builder organisation starts as Pending verification. GBQ staff check the business and mark it Verified — only then does it appear in the builder directory and become invitable. Until that moment the whole workspace is yours to set up (profile, capacity, members), and it says plainly that verification is awaited. The organisation page — My organisation in the sidebar — shows the current state, your plan and your lead allowance; if verification is declined, the reason is shown there, and a Support ticket asks for the decision to be reviewed.
If GBQ set the organisation up for you and sent an invitation, the link in that email creates the account instead: register with the invited address, confirm your email, and you join the organisation on your return to the link.
From the organisation’s page, add your teammates as members by their email address — they must already have a Modern GBQ account. Everyone in the organisation shares the same workspace, invitations, responses and history, and any active member can respond on the organisation’s behalf.
Your Builder workspace
Where: Builder workspace in the sidebar (also from My organisation)
The workspace opens on five live figures:
| Figure | Meaning |
|---|---|
| Awaiting your response | Open invitations your organisation hasn’t answered yet. |
| Due within 7 days | Open invitations whose response deadline falls in the next seven days. An invitation whose deadline has passed while the owner has not yet closed the round is counted on its own line — past the deadline, still open — never as due. |
| Leads this month | How many invitations you have opened this period against your plan’s allowance, and when the count resets — 1 of 2 used, resets 1 Nov. Unlimited on the plans that include it. |
| Selections to acknowledge | Homeowners who chose you and are waiting for your acknowledgement — the most time-sensitive item you can have. |
| Rating | Your organisation’s current star rating out of 5.00. |
Below them, Needs your attention queues the same things in the order to handle them — selections waiting on an acknowledgement first, then open invitations by closest deadline, each with a direct Respond, View or Review selection action — and Recent invitations keeps every project that has invited your organisation one click away, newest first, with its locality, deadline, engagement status and your own status on it.
Leads and plans
The invitation list — each project, its locality and its deadline — is free to see. Opening an invitation for the first time uses one lead from your plan’s monthly allowance; the workspace asks you to confirm before it does (Opening this invitation uses 1 of your N remaining leads), unless your plan is unlimited or you have opened it before. Once opened, an invitation stays open to you for free, however many times you come back. When the allowance is used up, opening another invitation is refused until the period resets, and the page points you to the plans. Your current plan, its renewal date and your lead allowance are on My organisation under Plan and billing.
Projects of your own
Projects in the sidebar is for your organisation’s own jobs: describe the site and the buildings, run the Grace Estimation Method, choose materials and price the scope with the same engine the homeowners use, keeping every version. A builder organisation that has projects lands on them after login; one that has none lands on the workspace.
All engagements (also reachable from the organisation page) is the full record: every invitation with its Respond / Revise response / View action, every preferred-builder selection with its Acknowledge and Decline controls, and your rating with its history.
Your profile: what homeowners see
Where: Your profile, on the Builder workspace
Your organisation’s directory entry shows its name and code, star rating, verification status and stated capacity. Two of those are yours to edit right on the workspace: Capacity (how many concurrent projects you are taking) and Notes — they are how you signal what work you actually want. Verification is decided by the Modern GBQ team, not self-declared, so a homeowner can trust what it says — and the directory lists verified organisations only, so every builder a homeowner can invite has been checked.
Invitations and the scope you’re pricing
Where: the invitation page, from the workspace queue
Invitations are issued against a homeowner’s builder-ready quote — an approved Detailed quote, or an approved Design quote for which architectural drawings exist. The homeowner — or anyone who manages the project with them — searches the builder directory and issues the invitations; the directory lists verified organisations only, so the checking happens on the builder’s side, once, rather than project by project. Every engagement carries a response deadline set from the platform’s response window (five days by default) — the invitation shows the exact deadline.
An invitation gives you everything needed to price seriously:
- The project and its site — suburb, region, postcode and country. The homeowner’s identity and street address stay private at this stage.
- The scope to price — the exact estimate version the homeowner approved, grouped by construction stage in the order of works on site — seventeen stages from preliminaries, site works and substructure through frame, roof, walls and lock-up, the services, linings and floors, to internal and external finishing, landscaping and completion: every included line with its quantity, waste allowance and labour hours, and any lines the homeowner explicitly excluded, listed separately so nothing is ambiguous. Whether the material and labour rates and the totals appear is the owner’s choice — when they are not shared, the lines carry quantities and hours only, and you price them with your own rates. When they are shared, every line amount is ex GST, and beneath the lines the table adds the owner’s markups (preliminaries, contingency and builder margin), then GST at the quote’s rate, to reach the approved total inc GST.
- Drawings & documents — the architectural drawings, site plan and specifications the project team has chosen to share with invited builders, each downloadable from the invitation page. A Design-pathway scope is issued only once the project has architectural drawings on file; the project team decides which files to share, and anything they keep private never appears.
- The response deadline and the engagement’s current status.
- Your response history on this invitation — every version your organisation has submitted, kept in full.
You can also send parts of a priced quote you own to trades. From the quote’s Trades entry, the labour of each trade on that version is gathered into a package — hours, quantities, the stage of works, the suburb and state, a start window and the drawings you tick — and sent to verified tradies from the directory, filtered by trade and state. Sending is free. Tradies answer with a lump sum ex GST (unit rates optional), blind to one another until the deadline; when you accept one, that figure replaces the labour pack’s rate for the trade on your version and the quote shows it as a trade quote in the tradie’s name. They never see the homeowner’s details or your margin. The trades guide describes their side.
Responding — and revising
Where: Your response, on the invitation page
Your response takes one of four forms:
| Response | When to use it |
|---|---|
| Accept | You’ll do the scope as priced. |
| Revised proposal | You’ll do it, with your own figure and terms — say what differs and why. |
| Request discussion | Something needs clarifying. Available once you have accepted, declined or sent a revised proposal, and right up to the owner’s final decision — even after the response window has closed. |
| Decline | Not for you. Declining an invitation carries no penalty — it’s the professional answer when the project doesn’t fit. |
Alongside the response type, the form gives you two ways to put a figure on the work and six written fields. Your margin % is your margin on the owner’s approved estimate — the form shows the floor the platform sets (15% unless the market’s pricing rule asks for more) and any ceiling, and refuses a figure outside them before anything is sent. The platform works out the price your margin produces on the owner’s cost, plus GST at the quote’s rate, and the owner sees it beside every other response. When the owner has not shared the rates, the margin still applies to their estimate — a figure you cannot see — and your resulting total appears on the invitation page once your response is in. Your price (a price revision) is a figure of your own, typed ex GST in the quote’s currency: the platform adds GST at the quote’s rate, and as you type the form shows the figure the homeowner will see inc GST. Every builder is treated as registered for GST, and everything the owner compares — an accepted estimate, your price, the price your margin produces — includes GST. If you give both, your price is what the owner compares and the margin is kept for reference. A price revision sent before this rule (18 October 2026) had no stated GST basis: the owner sees it as typed, marked GST basis not stated, so re-enter it ex GST when you revise. Then the written fields: Programme information, Notes, Qualifications, Exclusions, Proposed alternative materials and Proposed alternative construction methods. Use them — the homeowner reads exactly these fields, side by side with every other response, before any name is revealed.
For as long as the engagement is open for responses you can revise: the form pre-fills from your latest version, and submitting creates a new numbered version rather than editing the old one. Every version is kept, and the homeowner’s report always shows your latest. The deadline is enforced: a response after it is refused, even though the round stays open until the homeowner closes it by recording their feedback — the workspace marks such an invitation Deadline passed, still open. After the owner closes the round the invitation is view-only, apart from a request for discussion.
How the blind comparison works
The homeowner’s comparison report is anonymous at first: responses appear as Builder A, B, C… in a fixed order, with every figure and every written field visible but no names. Only after the homeowner records their feedback — a confirmation that they have read the blind report — are identities revealed, and only then can they select a builder.
This is deliberately in your favour if your offer is strong: a sharp, complete response from a newer organisation is read on exactly the same footing as one from an established name. What wins the blind round is the quality of the response itself.
When you’re selected
Where: Preferred builder selections, on All engagements (and the workspace queue)
A selection lands in your workspace queue and your notifications the moment the homeowner notifies it. Two honest answers exist:
- Acknowledge — you confirm your intent to proceed. The engagement moves to Acknowledged, its final state on the platform: the contract is now yours and the homeowner’s to conclude directly, outside Modern GBQ. The homeowner’s contact details are not shared on the platform — the owner, who now sees your name, code and rating, makes the approach.
- Decline, with a written reason — allowed, but this is the one act with a real cost: declining after being selected deducts half a star from your rating, and the event appears on your rating history with your reason. The homeowner can then select another builder from the same round.
A homeowner can also withdraw a selection, giving a written reason of their own; a withdrawal carries no penalty for you, and they may select another builder from the same responses.
Your rating, and how to protect it
Every builder organisation starts at 5.00 stars. Today exactly one thing lowers it: declining after being selected costs 0.5 stars per occurrence, each recorded on your rating history with the date, the change, the rating after, and the reason you gave. The rating can never fall below zero, and it is shown to homeowners in the builder directory and in your workspace.
Protecting it is therefore simple:
- Decline at the invitation stage, freely, whenever a project doesn’t fit — that costs nothing.
- Only respond Accept or Revised proposal on work you will actually take if chosen.
- Keep your capacity figure current so you aren’t invited into work you can’t do.
The programme on your estimates
Where: the quote’s Programme section; the Programme section of the report and of the client’s estimate
Beside the price, every priced version shows an indicative programme: expected working days per stage from the published stage durations — base days plus days per 100 m² of livable area, with each stage’s overlap of the one before it — and the quote’s size. Set a planned start and the stages take Monday-to-Friday dates with an expected finish and the total in weeks. Adjust any stage’s days, or type its start and end, when you know the block or the trades better than the table does; the suggested figure stays beside your adjustment with your name and the date, so the client sees what the platform suggested and what you changed.
Your client reads the same bars on the shared estimate and the report link for a Design or Detailed quote; a Ballpark shows them the total weeks only. The line under the section says the figures are indicative, in working days with public holidays not counted, and that your contract programme governs.
Stay informed and get help
Where: Notifications and Support, in the sidebar
Invitations, selections and support updates land in the Notifications centre, with an unread badge in the sidebar, one-click mark-as-read (per item or all at once) and per-channel preferences you control. Every in-app notification is also sent to your email address, from Modern GBQ’s own sender, so a new invitation reaches you without the app open; SMS can be switched on in your preferences but is not yet connected to a delivery provider. Check your workspace queue for deadlines — the response deadline is on every invitation.
Support is a real ticket system: describe the problem, give it a priority, track its status (Open → In progress → Resolved → Closed), and get notified when it’s resolved. Account at the foot of the sidebar is where you turn on two-factor sign-in with an authenticator app and keep your recovery codes.
| Priority | Use it for |
|---|---|
| P1 — Critical | Platform down, data loss or a security issue. |
| P2 — High | A major function is broken and is blocking your work. |
| P3 — Medium | A functional issue with a workaround, or moderate impact. |
| P4 — Low | A cosmetic issue, general question, or feature request. |
Getting the most out of it
- Work the queue in its order. Selections to acknowledge, then nearest deadlines — the workspace already sorts your day for you.
- Respond before the deadline, even if briefly. An answer (accept, decline or a revised proposal) keeps you in the round; silence takes you out of it. A Request discussion comes after your answer, any time before the owner decides.
- Use the excluded-lines list. It tells you exactly where the homeowner expects separate treatment — address those explicitly in your exclusions or a revised proposal.
- Write for the blind read. Your response is judged before your name is seen — make the numbers, the programme and the qualifications carry the pitch.
- Revise rather than pad. A revised proposal with a clear reason reads far better in comparison than a single inflated Accept.
- Fill the alternatives fields when you have a better way. Proposed alternative materials and methods are read as expertise, not as deviation — that is what they are there for.
- Treat your rating as capital. It is slow to earn back and visible to every homeowner your organisation is put in front of.
What’s coming
These are planned and not yet available. Nothing in the rest of this guide depends on them.
- Attachments on responses — supporting documents alongside a response; today a response is its figure and its written fields.
- Uploading the documents behind verification — licence, insurance and registration evidence attached to your organisation; today there is no in-app upload, and a Support ticket is the way to ask what the team needs.
- SMS delivery of notifications, once a provider is connected — email delivery and two-factor enrolment are already in place.
The ground rules
- Modern GBQ does not process payments, hold funds, or create contracts — responding to an invitation, or being selected, creates no contractual relationship through the platform.
- During the blind phase you are anonymous to the homeowner, and their identity and street address are withheld from you — the symmetry is the point.
- Declining a selection requires a written reason and costs rating; declining an invitation costs nothing.
- The figures you are shown are estimates prepared with the Grace Estimation Method — the scope you price against, not an offer from anyone.
- The Marketplace Agreement you accepted at organisation creation governs marketplace conduct; it and every other document are always readable at the Legal page.
Glossary
| Term | Meaning |
|---|---|
| GEM | The Grace Estimation Method — Sam Grace’s method that turns a project description into engineered quantities, with the working shown for every line. |
| Builder-ready quote | An approved Detailed quote, or an approved Design quote with drawings — the only kind an engagement can be started from. |
| Engagement | One round of inviting builders to respond to an approved quote, with its deadline and its comparison report. |
| Invitation | Your organisation’s place in one engagement; your responses attach to it. |
| Lead | One invitation opened for the first time, counted against your plan’s monthly allowance. Reopening is free; the list of invitations is always free. |
| Margin | Your percentage on the owner’s approved estimate, stated on your response; the platform turns it into the price the owner compares, inc GST. Your own price, when given, wins over it. |
| Your price | A figure of your own on a revised proposal, typed ex GST. The platform adds GST at the quote’s rate, and the owner compares it inc GST with every other response. |
| Response version | One submitted response. Revising creates a new version; nothing is edited or deleted. |
| Excluded lines | Lines of the approved quote the homeowner has taken out of the scope to price, listed separately on the invitation. |
| Blind comparison | The stage where responses are shown to the homeowner as Builder A, B, C… until they record feedback. |
| Preferred builder | The organisation the homeowner selected and notified; acknowledging confirms intent to proceed. |
| Rating | Your organisation’s score out of 5.00, reduced only by declining after selection. |
| Verification | The check the Modern GBQ team makes on a new builder organisation. Only a Verified organisation is listed in the directory and can be invited; a Pending one can still set up its workspace. |